At the moment we are experiencing technical problems with our new customer portal. We are working to solve this as quickly as possibly. Thanks in advance for your understanding. [...]
Diving inspections
On October 14, diving inspections will begin at several locations in the port area. The inspections are carried out to check the condition of the piles and attachments. The diving team will start from the western part of the Öhm [...]
Repair works at E.on may color water green in Pampus
Starting Saturday, October 12, and for approximately one month, E.ON will be conducting work on its district heating tank. Water from the tank will be discharged into Bråviken through a pipe system that leads to Pamus. The water [...]
Asphalting in the Pampus Terminal and in our Trailer Area
During the period 21st-27th of October, asphalting will take place in and around Pampusterminalen as well as in our Trailer Area. Please drive with extra caution and adhere to the speed limits. We thank you for your patience dur [...]
The rescue service is practicing in the Energy Port on 25/9
The exercise involves firefighting equipment and may be visible from a distance. [...]
Paving work at rail crossing during night
The night between Thursday, September 12th and 13th (10:00 PM – 5:00 AM), paving work will take place at the rail crossing at Pampus Terminal's Gate B, which will be closed during that time. Since the work is being carried out a [...]
Limited accessibility on Hamnbron and Packhusgatan
During August and September, work will be carried out on the district heating network at Hamnbron and Packhusgatan. During this time renovation work will also be carried out on the bridge, Hamnbron. This will result in limited a [...]
Our operations are back to normal, 26 july
The IT disruptions that affected us this morning have now been resolved, and our operations are back to normal. We apologize for any possible delays this caused and appreciate your understanding. [...]
Quays 57-59 closed for loading and unloading of ships from August 5th to September 1st.
The work on stormwater management at the Öhman Terminal is progressing. From Monday, August 5th until Sunday, September 1st, excavation will be carried out along quays 57-59 (from bollard 159). This means that during this period [...]
Traffic disruption on Energigatan 9, 10, 15 July
E.ON is carrying out work along 'Energigatan' July 9th The existing roof will be removed from the tank for district heating water on the morning of July 9th. This work should not cause traffic problems, but driving extra careful [...]